Blasting, Volume. 42, Issue 3, 54(2025)
Optimization of Hole Distribution and Delay Time in Blasting Excavation of Mine Roadway
[7] [7] ZHAO Rui, TAO Ming, XIANG Gong-liang, et al. Blasting induced dynamic stress concentration and failure characteristics of deep-buried rock tunnel[J]. Journal of Central South University, 2024, 31(7): 2321-2340.
[8] [8] ZHANG Yu-wei, ZHANG Yi-duo, SONG Zhan-ping, et al. A LFPP-FAHP based evaluation model of blasting scheme for tunnel undercrossing existing buildings[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research, 2024, 153(1): 105937-105937.
[9] [9] VARDAR O, WEI Chun-chen, ZHANG Cheng-guo, et al. Numerical investigation of impacts of geological faults on coal burst proneness during roadway excavation[J]. Bulletin of Engineering Geology and the Environment, 2021, 81(1): 1-8.
[10] [10] REHMAN U J, PARK D, AHN K J. Predicting blast-induced damage and dynamic response of drill-and-blast tunnel using three-dimensional finite element analysis[J]. Applied Sciences, 2024, 14(14): 6152-6152.
[11] [11] GUAN Zhen-chang, XIE Li-fu, CHEN Dong, et al. Numerical simulation and field monitoring of blasting vibration for tunnel in-situ expansion by a non-cut blast scheme[J]. Sensors, 2024, 24(14): 4546-4546.
Get Citation
Copy Citation Text
HU Gang, FEI Hong-lu, GUO Yu-xin. Optimization of Hole Distribution and Delay Time in Blasting Excavation of Mine Roadway[J]. Blasting, 2025, 42(3): 54
Category:
Received: Feb. 16, 2025
Accepted: Sep. 18, 2025
Published Online: Sep. 18, 2025
The Author Email: