Blasting, Volume. 42, Issue 3, 54(2025)
Optimization of Hole Distribution and Delay Time in Blasting Excavation of Mine Roadway
Get Citation
Copy Citation Text
HU Gang, FEI Hong-lu, GUO Yu-xin. Optimization of Hole Distribution and Delay Time in Blasting Excavation of Mine Roadway[J]. Blasting, 2025, 42(3): 54
Category:
Received: Feb. 16, 2025
Accepted: Sep. 18, 2025
Published Online: Sep. 18, 2025
The Author Email: