Blasting, Volume. 42, Issue 3, 126(2025)

One-time Combined Blasting Demolition of Cross-Line Overpass Group in Long Section of Expressways

SHEN Dian-dong1, ZHOU Zi-zheng2, YU Xin1, JIA Yong-sheng2,3、*, LIU Bo-ping1, HUANG Xiao-wu3, JIANG Hai-guang1, and CAI Qin-feng1
Author Affiliations
  • 1Beijing-Hong Kong-Macao Expressway Reconstruction and Expansion Project Management of Hubei Communication Co., Ltd., Wuhan 430056, China
  • 2State Key Laboratory of Precision Blasting, Jianghan University, Wuhan 430056, China
  • 3Wuhan Explosion & Blasting Co., Ltd., Wuhan 430056, China
  • show less
    References(2)

    [7] [7] SON J, ASTANEH A. Blast protection of cable-stayed and suspension bridges[C]//Lifeline Earthquake Engineering in a Multihazard Environment, ASCE. Reston, VA, 2009: 15-23.

    [13] [13] SARBJEET Singh, MEHRDAD Mirzakashani, ABDOL Hagh. Demolition of the Grace Memorial and Silas N. Pearman Bridges over Cooper River, South Califorina, USA-A Case Study[J]. Structures Congress, 2008: 1-10.

    Tools

    Get Citation

    Copy Citation Text

    SHEN Dian-dong, ZHOU Zi-zheng, YU Xin, JIA Yong-sheng, LIU Bo-ping, HUANG Xiao-wu, JIANG Hai-guang, CAI Qin-feng. One-time Combined Blasting Demolition of Cross-Line Overpass Group in Long Section of Expressways[J]. Blasting, 2025, 42(3): 126

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Mar. 19, 2025

    Accepted: Sep. 18, 2025

    Published Online: Sep. 18, 2025

    The Author Email: JIA Yong-sheng (jason03566@163.com)

    DOI:10.3963/j.issn.1001-487x.2025.03.014

    Topics