NUCLEAR TECHNIQUES, Volume. 47, Issue 5, 050018(2024)

Design and development of ECRH launcher system on HL-3 tokamak

Wanxin ZHENG, Jiruo YE, Gangyu CHEN, and Mei HUANG*
Author Affiliations
  • Southwestern Institute of Physics, Chengdu 610041, China
  • show less
    Figures & Tables(11)
    Overall layout of ECRH system for HL-3 tokamak
    Microwave deposition at different frequencies
    Diagram of three launchers' positions
    Schematic diagram of the optical path of the mid equatorial launcher
    Conceptual design drawing of the No.1 upper launcher
    Optical path design of the No.2 upper launcher
    Test results of polar rotation speed of the mid equatorial launcher (a) Left path, (b) Right path
    Test results of polar rotation speed of the No.1 upper launcher (a) Left path, (b) Right path
    Calibration of the transmission angle of the No.1 upper launcher (a) Left path, (b) Right path
    • Table 1. The parameters and functions of the launcher

      View table
      View in Article

      Table 1. The parameters and functions of the launcher

      中平面天线

      Mid equatorial launcher

      一号上斜天线

      No.1 upper launcher

      二号上斜天线

      No.2 upper launcher

      窗口大小 Window size / mm450×500Ø300Ø200
      布局 Layout / mm2×21×21×1
      频率 Frequency / GHz68/105105/140105
      功率容量Power capacity / MW0.5+321
      脉冲宽度 Pulse width / s1/333

      注入角度

      Injection angle / (°)

      环向:-18.5~18.5 Toroidal: -18.5~18.5

      极向:-17~17 Poloidal: -17~17

      极向:-80 ~ -15

      Poloidal: -80 ~ -15

      极向:-82 ~ -69

      Poloidal: -82 ~ -69

      功能 Function

      加热,电流驱动,辅助启动,NTM抑制

      Heating, current driving, auxiliary start, NTM control

      NTM抑制

      NTM control

      NTM抑制

      NTM control

    • Table 2. Measurement of polar transmission angle for the No.1 upper launcher

      View table
      View in Article

      Table 2. Measurement of polar transmission angle for the No.1 upper launcher

      极向发射角度

      Poloidal injection angle / (°)

      电机绝对位置

      Absolute position of motor / mm

      丝杠移动距离

      Screw movement distance / mm

      左路Left path-15.00 ~ -80.3421.968~82.46860.5
      右路 Right path-15.00 ~ -80.26-43.815~16.68560.5
    Tools

    Get Citation

    Copy Citation Text

    Wanxin ZHENG, Jiruo YE, Gangyu CHEN, Mei HUANG. Design and development of ECRH launcher system on HL-3 tokamak[J]. NUCLEAR TECHNIQUES, 2024, 47(5): 050018

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category: Research Articles

    Received: Apr. 20, 2024

    Accepted: --

    Published Online: Jul. 8, 2024

    The Author Email: HUANG Mei (黄梅)

    DOI:10.11889/j.0253-3219.2024.hjs.47.050018

    Topics