Blasting, Volume. 42, Issue 3, 95(2025)

Optimization Method for Powder Ore Rate in Limestone Blasting based on Air-decking Technology

YANG Ming1, ZHANG Jin-hua2、*, ZHAO Kai-xuan2, HE Wu-yi3,4, WANG Jun-qing1, and GAO Jing1
Author Affiliations
  • 1China Non Metallic Materials Nanjing Mining Engineering Co., Ltd., Nanjing 210016, China
  • 2Department of Civil and Airport Engineering, Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China
  • 3Nanchang Vocational University, Nanchang 330007, China
  • 4Jiangxi Rongda Blasting New Technology Development Co., Ltd., Nanchang 330038, China
  • show less
    Figures & Tables(0)
    Tools

    Get Citation

    Copy Citation Text

    YANG Ming, ZHANG Jin-hua, ZHAO Kai-xuan, HE Wu-yi, WANG Jun-qing, GAO Jing. Optimization Method for Powder Ore Rate in Limestone Blasting based on Air-decking Technology[J]. Blasting, 2025, 42(3): 95

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Jan. 8, 2025

    Accepted: Sep. 18, 2025

    Published Online: Sep. 18, 2025

    The Author Email: ZHANG Jin-hua (zjh982038@nuaa.edu.cn)

    DOI:10.3963/j.issn.1001-487x.2025.03.011

    Topics