NUCLEAR TECHNIQUES, Volume. 45, Issue 12, 120102(2022)
The design of Hefei advanced light facility timing system
Fig. 2. Schematic diagram of the actual working sequence of each subsystem after receiving the trigger from the timing system (the horizontal axis only represents the chronological order)
Fig. 4. Schematic diagram of arbitrary bucket filling in storage ring
Fig. 7. Hardware structure diagram of the prototype system (a) and photo of a prototype system (b)
Fig. 8. Jitter result of RF clock (arrows point to enlarged test results)
Fig. 9. Oscilloscope output without DC (a) and with DC (b) (arrows point to enlarged test results)
Fig. 10. Graph of optical fiber transmission delay with temperature
Fig. 11. Measurements of delay adjustment (a) and delay range (b) (arrows point to enlarged test results)
Fig. 12. Test result of delay adjustment (a) and test result of pulse width adjustment (b)
Fig. 13. Measurements of the first four pulse width adjustment range (a) and other pulses width range (b) (arrows point to enlarged test results)
|
|
|
|
|
Get Citation
Copy Citation Text
Gangjia ZHAI, Xiaokang SUN, Ke XUAN, Liuguo CHEN, Chuan LI, Gongfa LIU. The design of Hefei advanced light facility timing system[J]. NUCLEAR TECHNIQUES, 2022, 45(12): 120102