High Power Laser and Particle Beams, Volume. 34, Issue 8, 084004(2022)

Influence and analysis of power grid fluctuation on the operation of shanghai synchrotron radiation facility

Guangwei Jiao, Shunqiang Tian*, Wenzhi Zhang, Xu Wu, Bo Sun, Lin Jin, Shenjie Zhao, and Junjie Xu
Author Affiliations
  • Shanghai Synchrotron Radiation Facility Science Centre, Shanghai Advanced Research Institute, Chinese Academy of Sciences, Shanghai 201204, China
  • show less
    Figures & Tables(7)
    Grid fluctuations in operation during 2015~2021
    Voltage transient waveforms recorded by PQube in waveform form
    MegaDySC voltage compensation case
    • Table 1. Investigation of State Grid Pudong Power Supply Branch on sensitive users within its jurisdiction

      View table
      View in Article

      Table 1. Investigation of State Grid Pudong Power Supply Branch on sensitive users within its jurisdiction

      equipmentequipment with stand voltage sag amplitude /%
      package tester97
      programmable controller80
      air compressor80
      refrigerator80
      numerical control machine tools90
      air conditioner80
      computer60
    • Table 2. Data of voltage detector within 5 miles of Zhangjiang Hi-Tech

      View table
      View in Article

      Table 2. Data of voltage detector within 5 miles of Zhangjiang Hi-Tech

      distance/mvoltage sag amplitude /%
      ~557.1
      ~579.2
      ~576.0
      ~557.7
      ~554.3
      ~563.0
      ~559.2
      ~5 ~5 ~5 61.4 76.5 74.1
    • Table 3. Main vulnerable equipment of each sub-system

      View table
      View in Article

      Table 3. Main vulnerable equipment of each sub-system

      systemvulnerable devices
      magnet power supplyall magnets for storage ring and booster, partial magnets of linac, low-energy transfer line, high-energy transfer line
      cryogenicscompressor
      radio frequencyburst disc, ion pump, some small components
      beam instrumentationFPGA system, transverse feedback system
      beamlinemonochromator and super-fast big area detector
      general aided technologywater flow monitoring and air circuit-breaker
      vacuumvacuum gauge and power supply
      radiation protectionPPS control system
    • Table 4. Grid fluctuation fault classification table

      View table
      View in Article

      Table 4. Grid fluctuation fault classification table

      series No. voltage fluctuation range beam influenceinvolvedspecific characterization disposal plan
      1>90%no effectnonothe accelerator operations group checks critical systems
      285%-90%duration of beam loss 0~3 hRF, magnet power supply, beam instrumentationRF trip, storage ring BQS magnet power failure, beam instrumentation server failureinvolved in the professional group to deal with the fault, other professional groups to investigate
      30-85%duration of beam loss 3~24 hRF, magnet power supply, beam instrumentation, beamline,cryogenicRF trip, storage ring BQS magnet power failure, beam instrumentation server failure,cryogenic system failureinvolved in the professional group to deal with the failure, other professional groups to investigate, the accelerator physics group to check the status of the machine, radiation protection group to open the tunnel
    Tools

    Get Citation

    Copy Citation Text

    Guangwei Jiao, Shunqiang Tian, Wenzhi Zhang, Xu Wu, Bo Sun, Lin Jin, Shenjie Zhao, Junjie Xu. Influence and analysis of power grid fluctuation on the operation of shanghai synchrotron radiation facility[J]. High Power Laser and Particle Beams, 2022, 34(8): 084004

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category: Particle Beams and Accelerator Technology

    Received: Dec. 9, 2021

    Accepted: May. 24, 2022

    Published Online: Aug. 8, 2022

    The Author Email: Shunqiang Tian (tiansq@sari.ac.cn)

    DOI:10.11884/HPLPB202234.210553

    Topics