Blasting, Volume. 38, Issue 3, 45(2021)
Analysis of Stemming Length of Borehole in Blasting
[3] [3] QIU X Y, SHI X Z, ZHANG S, et al.Experimental study on the blasting performance of water-soil composite stemming in underground mines [J].Advances in Materials Science and Engineering, 2018(1):1-11.
[15] [15] ISAKOV A L.Model investigation of stemming behavior and calculation ofthe pulse during firing of borehole charges[J].Soviet Mining Science,1979,15(4):331-339.
Get Citation
Copy Citation Text
ZHANG Yan-jun, CHEN Yan-wu, LEI Mei-rong, ZHANG Dong-rang. Analysis of Stemming Length of Borehole in Blasting[J]. Blasting, 2021, 38(3): 45
Category:
Received: Apr. 22, 2021
Accepted: --
Published Online: Feb. 2, 2024
The Author Email: ZHANG Yan-jun (zyjhappy2000@163.com)