NUCLEAR TECHNIQUES, Volume. 46, Issue 6, 060101(2023)

Data acquisition of bunch IDs in timing system of SHINE beamlines and end stations

Liang YIN1, Mengqi ZENG1, Congcong YIN1,2、*, and Ping HUAI1,2
Author Affiliations
  • 1ShanghaiTech University, Shanghai 200120, China
  • 2Shanghai Aavanced Research Institute, Chinese Academy of Sciences, Shanghai 201210, China
  • show less
    References(18)

    [3] LI Cheng. The research on the timing synchronization technology with high precision for large scale physics experiments[D](2012).

    [5] LIU Ming, YIN Chongxian, ZHAO Liying et al. Design of a novel timing system[J]. Nuclear Techniques, 33, 425-428(2010).

    [7] Kalantari B, Biffiger R. SwissFEL Timing system: first operational experience[C], 232-237(2017).

    [13] Goujon G, Broquet A, Janvier N. Refurbishment of the ESRF accelerator synchronisation system using White Rabbit[C], 224-228(2017).

    [15] LI Weilong. Implementation of WR timing system in BPM acquisition system[D](2020).

    Tools

    Get Citation

    Copy Citation Text

    Liang YIN, Mengqi ZENG, Congcong YIN, Ping HUAI. Data acquisition of bunch IDs in timing system of SHINE beamlines and end stations[J]. NUCLEAR TECHNIQUES, 2023, 46(6): 060101

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category: Research Articles

    Received: Dec. 23, 2022

    Accepted: --

    Published Online: Jul. 5, 2023

    The Author Email:

    DOI:10.11889/j.0253-3219.2023.hjs.46.060101

    Topics