Blasting, Volume. 42, Issue 2, 67(2025)
Control Technology for Oversized Fragments in Engineering Blasting at Pingtanyuan Pumped-storage Power Station Project
[5] [5] FADILLAH T. The rock fragmentation control in long hole blasting case study Antam Pongkor underground gold mine[J]. IOP Conference Series Earth and Environmental Science, 2018, 212(1): 012062.
[8] [8] LENG Zhen-dong, LU Wen-bo, CHEN Ming, et al. Explosion energy transmission under side initiation and its effect on rock fragmentation[J]. International Journal of Rock Mechanics and Mining Sciences, 2016, 86: 245-254.
[9] [9] BRINKMANN J R. An experimental study of the effects of shock and gas penetration in blasting[J]. The 3rd International Symposium Rock Fragmentation by Blasting. Brisbane, 1990: 55-66.
[12] [12] CEVIZCI H, OZKAHRAMAN H. The effect of blast hole stemming length to rockpile fragmentation at limestone quarries[J]. International Journal of Rock Mechanics and Mining Sciences, 2012, 53: 32-35.
[20] [20] CHEN Ming, YE Zhi-wei, WEI Dong, et al. The movement process and length optimization of deep-hole blasting stemming structure[J]. International Journal of Rock Mechanics and Mining Sciences, 2021, 146: 104836.
Get Citation
Copy Citation Text
TAN Zhan-zhi, ZHANG Guang-hui, CHEN Ming, ZHANG Jia-tuo, CHENG Yuan-long. Control Technology for Oversized Fragments in Engineering Blasting at Pingtanyuan Pumped-storage Power Station Project[J]. Blasting, 2025, 42(2): 67
Category:
Received: Jan. 26, 2025
Accepted: Jun. 24, 2025
Published Online: Jun. 24, 2025
The Author Email: CHEN Ming (whuchm@whu.edu.cn)