Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator
Fig. 7. Measurement results of the leakage field for the Lambertson magnet
Fig. 8. Beam measurement results of the leakage field for the Lambertson magnet
Fig. 9. Measurement results of actual bunch length when the beam power on the target is 140 kW
Fig. 12. Large dose rate hotspot at the Lambertson magnet entrance
Fig. 13. Neutron detector (R3MB03INBLM) measurement results varying with the collimator vertical acceptance
Get Citation
Copy Citation Text
Mingyang Huang, Shouyan Xu, Xin Qi, Sheng Wang. Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator[J]. High Power Laser and Particle Beams, 2023, 35(12): 124001