High Power Laser and Particle Beams, Volume. 35, Issue 12, 124001(2023)

Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator

Mingyang Huang1,2,3,4, Shouyan Xu1,2, Xin Qi1,2, and Sheng Wang1,2,3,4
Author Affiliations
  • 1Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049, China
  • 2Spallation Neutron Source Science Center, Dongguan 523808, China
  • 3University of Chinese Academy of Sciences, Beijing 100049, China
  • 4Key Laboratory of Particle Acceleration Physics & Technology, Chinese Academy of Sciences, Beijing 100049, China
  • show less
    Figures & Tables(13)
    Layout of the CSNS extraction system
    Control system of the extraction timing
    Current curves of 8 Kickers after the timing calibration
    Layout of the beam extraction process
    Time structure of the injection beam
    Beam distribution on the target
    Measurement results of the leakage field for the Lambertson magnet
    Beam measurement results of the leakage field for the Lambertson magnet
    Measurement results of actual bunch length when the beam power on the target is 140 kW
    Measurement results of 8 Kicker waveforms
    Variation diagrams of Kicker waveform
    Large dose rate hotspot at the Lambertson magnet entrance
    Neutron detector (R3MB03INBLM) measurement results varying with the collimator vertical acceptance
    Tools

    Get Citation

    Copy Citation Text

    Mingyang Huang, Shouyan Xu, Xin Qi, Sheng Wang. Beam extraction commissioning and extraction beam loss optimization for China Spallation Neutron Source accelerator[J]. High Power Laser and Particle Beams, 2023, 35(12): 124001

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Apr. 30, 2023

    Accepted: Oct. 29, 2023

    Published Online: Dec. 27, 2023

    The Author Email:

    DOI:10.11884/HPLPB202335.230110

    Topics