NUCLEAR TECHNIQUES, Volume. 46, Issue 7, 070102(2023)
Development and implementation of an EPICS-based timing equipment control system for SHINE beamlines and endstations
[4] LI Cheng. Research on high-precision time synchronization technology of large-scale physical experiment device[D](2012).
[6] PAN Weibin. Research on high precision time measurement system of LHAASO experiment[D](2014).
[14] Krejcik P, Akre R, Allison S et al. Timing and synchronization at the LCLS[J]. SLAC Publication(2007).
Get Citation
Copy Citation Text
Mengqi ZENG, Liang YIN, Congcong YIN, Ping HUAI. Development and implementation of an EPICS-based timing equipment control system for SHINE beamlines and endstations[J]. NUCLEAR TECHNIQUES, 2023, 46(7): 070102
Category: Research Articles
Received: Mar. 1, 2023
Accepted: --
Published Online: Aug. 3, 2023
The Author Email: