Blasting, Volume. 41, Issue 1, 127(2024)
Blasting Demolition of Xiujiang Double Bridges in Complex Environment
[2] [2] LIU Guo-jun,LIANG Rui,YANG Yuan-bing.Explosive demolition of reinforced concrete simply supported beam bridge under complex environment[J].Blasting,2017, 34(4):115-119.(in Chinese)
[7] [7] ZHOU Jia-han.Discussion on calculation formula of col lapsing vibration velocity caused by blasting demolition [J].Engineering Blasting,2009,15(1):1-4.(in Chinese)
[11] [11] YAO Jin-jie.Scrap bridge destroyed by controlled explosion[J].Blasting,2001,18(2):79-80.(in Chinese)
[13] [13] XIE Xian-qi,HAN Chuan-wei,JIA Yong-sheng,et al.Explosive demolition of Yichun bridge[J].Blasting,2012, 29(1):62-64.(in Chinese)
[15] [15] ZHAO Ming-sheng,LONG Yuan,JIA Yong-sheng,et al.Control blasting technology for bridge with prestressed continuous concrete beams[J].Blasting,2015,32(4):103-109.(in Chinese)
Get Citation
Copy Citation Text
CHEN Hao, TAN Xue-gang, HUANG Long-hua, HE Wu-yi. Blasting Demolition of Xiujiang Double Bridges in Complex Environment[J]. Blasting, 2024, 41(1): 127
Category:
Received: Jan. 16, 2022
Accepted: --
Published Online: Aug. 15, 2024
The Author Email: CHEN Hao (979324514@qq.com)