Blasting, Volume. 40, Issue 3, 123(2023)
Study on Span-by-span Delay Bidirectional Blasting Demolition for Simply Supported Aqueduct with High Piers
[2] [2] ZHOU Xiang-lei, CHEN De-zhi, LUO Peng, et al.Blasting demolition of prestressed cable-stayed bridge with single tower and single cable plane[J].Blasting, 2020, 37(4): 89-93, 137.(in Chinese)
[4] [4] ZHANG Wen-xi.Blasting demolition of simply supported continuous reinforced concrete bridge[J].Blasting, 2022, 39(1): 130-133.(in Chinese)
[6] [6] JIANG Wen-jun, TANG Chun-hai, CHENG Gui-hai.Demolition blasting technology of multi span simply supported beam bridge based on numerical simulation[J].Engineering Blasting, 2022, 28(1): 91-98.(in Chinese)
[8] [8] WU Xi-nan, NIE Qun-fu.Controlled blasting technology for demolition blasting of high and large aqueduct in complex environment[J].Engineering Blasting, 2022,28(5): 81-87.(in Chinese)
[10] [10] SUN Jin-shan, JIANG Yue-fei, CHEN Qian-wei, et al.Selection of initiation delay time for arch aqueduct blasting under condition of span by span collapse and pier retaining[J].Blasting, 2021, 38(4): 115-119, 162.(in Chinese)
[12] [12] XIE Xu-wen, YANG Zhun.Discussion on blasting notch parameters of simply supported structure controlled by orientation[J].Mining Technology, 2017, 17(1): 90-91, 94.(in Chinese)
[14] [14] JIA Yong-sheng, XIE Xian-qi, LI Xin-yu, et al.Numerical simulation for demolition of structures[J].Rock and Soil Mechanics, 2008(1): 285-288.(in Chinese)
[16] [16] WU Qing, XIA Yun-peng, ZHANG Yao-liang.Numerical simulation of directional collapse effect under different blasting gap of chimney[J].Initiators & Pyrotechnics, 2022, 205(2): 63-68.(in Chinese)
[19] [19] HU Bin, YANG Sai-qun, LI Hong-wei, et al.Calculation and numerical simulation of blasting cutting angle of an ultra-high reinforced concrete chimney[J].Engineering Blasting, 2022, 28(1): 99-106.(in Chinese)
[21] [21] CHENG Guo-dong, LIU Ming-zhong, LI Xiu-lei, et al.Research on blasting demolition construction technology of Yongsheng aqueduct of four main canal[J].Henan Science and Technology, 2018(1): 83-86.(in Chinese)
[23] [23] LI Yu-jing, ZHAO Wen, ZHANG Bao-liang, et al.Demolition blasting of a 100 m high steel-concrete chimney with a small angle[J].Engineering Blasting, 2021, 27(6): 80-85, 91.(in Chinese)
Get Citation
Copy Citation Text
YE Jian-jun, PENG Qing-bo, HAN Xue-jun, DUAN Yi-yan. Study on Span-by-span Delay Bidirectional Blasting Demolition for Simply Supported Aqueduct with High Piers[J]. Blasting, 2023, 40(3): 123
Category:
Received: Feb. 27, 2023
Accepted: --
Published Online: Jan. 15, 2024
The Author Email: YE Jian-jun (715470323@qq.com)