High Power Laser and Particle Beams, Volume. 35, Issue 8, 084001(2023)
Design and implementation of one key on/off program at the accelerator of CSNS
There are hundreds of electric power supplies and radio frequency equipment in the accelerator of CSNS. Operations of these devices are executed through twenty-odd operator interfaces, which are time-consuming and cumbersome. During these processes, breakdowns are easy to occur but difficult to debug. To simplify the machine operation process, a one-key-on/off-operation program is developed. This program integrates the twenty-odd operator interfaces into a single one. The switch on/off operation of every device is realized in a thread, and the program completes the operation of all the devices concurrently. This program accomplishes the machine snapshot save/restore and the switch on/off operation of all the electric power supplies and radio frequency equipment through a one-button operation in the operator interface. With this program, the time needed to switch on/off all the devices in the machine is reduced from forty minutes to about two minutes. This program could be applied to other facilities.
Get Citation
Copy Citation Text
Mingtao Li, Yuliang Zhang, Yue Yuan, Xuan Wu, Kangjia Xue, Lin Wang, Yongcheng He, Peng Zhu. Design and implementation of one key on/off program at the accelerator of CSNS[J]. High Power Laser and Particle Beams, 2023, 35(8): 084001
Category: Particle Beams and Accelerator Technology
Received: Jan. 19, 2023
Accepted: Mar. 28, 2023
Published Online: Aug. 16, 2023
The Author Email: