High Power Laser and Particle Beams, Volume. 35, Issue 9, 092001(2023)
Gain degeneration and maintance project of 400 mm aperture disk amplifier
One of the main problems occur during inertial confinement fusion (ICF) laser facility’s long-term operation is the gain degeneration of the 400 mm aperture slab amplifier,which will affect the output of the facility and the laser beam quality. A study on gain degeneration causing by several factors was carried out and a normalization theory model from all the factors has been built. The test was accomplished on two groups of 400 mm aperture, 4×2 composition multi-segment slab amplifier with each group includes 9 slabs. The gain degenerating rate was about 10.2% after 10 years, 3 000 shots of work which is in accordance with the theoretical predication. A maintance project for the large aperture slab amplifier has been drawn up to keep the gain degeneration less than 1.5% during long-term operation of the ICF facility.
Get Citation
Copy Citation Text
Yong Liu, Wenlong Wu, Wenqi Chen, Donghui Lin, Qian Xiong, Lin Wang, Zhenguo Wang, Lin Chen. Gain degeneration and maintance project of 400 mm aperture disk amplifier[J]. High Power Laser and Particle Beams, 2023, 35(9): 092001
Category: Operation and Maintenance of Large Scale Scientific Facility
Received: Jan. 9, 2023
Accepted: Aug. 15, 2023
Published Online: Oct. 17, 2023
The Author Email: