Technology of Water Treatment, Volume. 51, Issue 8, 153(2025)

Application of UCT Process in a WWTP Expansion and Reconstruction Project

YANG Deng
Author Affiliations
  • GDEP Engineering Research & Design Institute Co Ltd, Guangzhou 510080, China
  • show less

    The design treatment scale of phase I project of a WWTP in Huizhou City is 1.0×104 m3/d, the "A/A/O oxidation ditch +high efficiency sedimentation tank + rotary fibre-plate filter" treatment process was adopted. Due to increased discharge of domestic sewage, the treatment capacity of the phase II expansion project was 2.0×104 m3/d and the phase I project was reconstructed in 2020, the main treatment process was UCT+high efficiency sedimentation tank + Rotary microfilter. The operation results showed that the eflluent quality stably met the stricter values of discharge standard of water pollutants in watershed of DanShui River and ShiMa River (DB 44/2050-2017) and of first level A criteria in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002) in 2023, the average annual removal rate of CODcr, BOD5, SS, NH3-N, TN and TP increased by 4.87%, 5.93%, 1.87%, 0.67%, 7.97% and 2.27% compared with 2019, respectively.

    Tools

    Get Citation

    Copy Citation Text

    YANG Deng. Application of UCT Process in a WWTP Expansion and Reconstruction Project[J]. Technology of Water Treatment, 2025, 51(8): 153

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Sep. 29, 2024

    Accepted: Aug. 22, 2025

    Published Online: Aug. 22, 2025

    The Author Email:

    DOI:10.16796/j.cnki.1000-3770.2025.08.025

    Topics