High Power Laser and Particle Beams, Volume. 36, Issue 7, 076001(2024)
Commission method of the primary helium circulator of HTGR under variable resistance condition
Fig. 2. Relationship between the characteristics of centrifugal fans and the resistance of pipe network
Fig. 3. Schematic diagram of working medium flow in centrifugal impeller
Fig. 4. Schematic diagram of centrifugal impeller outlet velocity triangle
Fig. 5. Distribution of the cold test operation points of the primary helium circulator on its performance curve
Fig. 6. Distribution of thermal test operation points of the primary helium circulator on its performance curve
|
|
|
Get Citation
Copy Citation Text
Lin Ye, Yijie Yan, Weiqiang Xu, Feng Zhao, Guangjian Chen, Chao Li, Yingjie Zhu. Commission method of the primary helium circulator of HTGR under variable resistance condition[J]. High Power Laser and Particle Beams, 2024, 36(7): 076001
Category:
Received: Dec. 20, 2023
Accepted: Apr. 2, 2024
Published Online: Jun. 21, 2024
The Author Email: Yan Yijie (yyjwolf9527@163.com)