High Power Laser and Particle Beams, Volume. 34, Issue 2, 023002(2022)

Circuit Simulation of GJB151B CS115 Part І: The analysis of calibration equipment indicators

Zhitong Cui... Wei Chen, Yayun Dong, Xin Nie, Wei Wu and Feng Qin |Show fewer author(s)
Author Affiliations
  • State Key Laboratory of Intense Pulsed Radiation Simulation and Effect, Northwest Institute of Nuclear Technology, Xi’an 710024, China
  • show less
    Figures & Tables(11)
    Requirements of calibration setup and waveform in CS115
    Circuit model of the calibration platform in CS115
    Measured and simulated VSWR of FCC-BCICF-1
    Direct output and calibration waveform under reference setup in simulation
    Simulated calibration waveform with different L0 of pulsed current source
    Simulated calibration waveforms with different Leq
    Simulated calibration waveforms with different Req
    Simulated calibration waveforms with different Lf and Cf
    Regions of current injection probe indicators according to the ferrite-core impedance
    • Table 1. Indicators of calibration waveform with different L0 , Leq and Req

      View table
      View in Article

      Table 1. Indicators of calibration waveform with different L0 , Leq and Req

      rise time/nsfall time/nsVRE/kVVFE/kVFDR/%
      impulse generator output with 50 Ω load0.71.1110
      L0=32 nH, Req=216 Ω, Leq=17.5 μH1.21.40.590.4917
      inductance of the generatorL0=46 nH1.31.70.580.4916
      L0=60 nH1.52.10.560.4913
      Req of the injection probe modelReq=8 Ω1.31.50.130.128
      Req=32 Ω1.31.50.340.3012
      Req=120 Ω1.21.40.540.4615
      Req=480 Ω1.21.40.640.5317
      Leq of the injection probe modelLeq=2 μH1.21.40.590.2754
      Leq=5 μH1.21.40.590.4032
      Leq=12.5 μH1.21.40.590.4720
      Leq=30 μH1.21.40.590.5114
    • Table 2. The rise time and fall time of calibration waveform with different Req and Ceq

      View table
      View in Article

      Table 2. The rise time and fall time of calibration waveform with different Req and Ceq

      Ceq=10 pFCeq=20 pFCeq=30 pFCeq=40 pFCeq=50 pF
      tr/nstp/nstr/nstp/nstr/nstp/nstr/nstp/nstr/nstp/ns
      Req=8 Ω1.31.41.31.51.31.51.41.61.41.6
      Req=32 Ω1.21.41.31.51.41.61.61.81.82.0
      Req=120 Ω1.21.41.31.51.61.81.92.22.42.6
      Req=216 Ω1.11.31.41.51.71.92.12.32.62.9
      Req=400 Ω1.01.31.41.51.71.92.22.42.83.0
    Tools

    Get Citation

    Copy Citation Text

    Zhitong Cui, Wei Chen, Yayun Dong, Xin Nie, Wei Wu, Feng Qin. Circuit Simulation of GJB151B CS115 Part І: The analysis of calibration equipment indicators[J]. High Power Laser and Particle Beams, 2022, 34(2): 023002

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category: High Power Microwave Technology

    Received: Sep. 10, 2021

    Accepted: Nov. 24, 2021

    Published Online: Jan. 26, 2022

    The Author Email:

    DOI:10.11884/HPLPB202234.210406

    Topics