Resources Science, Volume. 42, Issue 5, 825(2020)

Investment timing and option value of afforestation carbon sequestration project under carbon trading mechanism

Xianlei CAO*
Author Affiliations
  • Faculty of International Trade, Shanxi University of Finance and Economics, Taiyuan 030006, China
  • show less
    Figures & Tables(9)
    Impact of carbon sequestration price volatility on the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project
    Impact of carbon sequestration transaction cost on the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project
    Impact of project filing success rate on the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project
    Impact of timber price changes on the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project
    Impact of labor price on the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project
    • Table 1. Classification and descriptive statistics of variables in the model

      View table
      View in Article

      Table 1. Classification and descriptive statistics of variables in the model

      分类变量内容单位求解方法(取值)
      微观项目参数Vw木材销售的收入与各项投入之差万元/hm2式(4)
      C1项目备案立项阶段的投资额贴现值万元/hm20.01
      C2项目建设与运营阶段的投资额贴现值万元/hm25.43
      θ碳汇实物量参数t式(6)
      T项目计入期限20
      宏观变量参数r风险调整贴现率a%1.03
      δ便利收益(价值漏损率)b%1.02
      σ碳汇价格波动率%34.0(历史数据法)
      ρ项目备案成功率%15.2
      主观参数μ碳价格预期增长率%0.01
      β1中间变量参数式(10)
    • Table 2. Classification and analysis methods of variables

      View table
      View in Article

      Table 2. Classification and analysis methods of variables

      分类变量单位分析方法及原因
      碳市场环境碳价波动率%数值模拟分析
      碳汇交易成本万元数值模拟分析
      项目备案成功率%数值模拟分析
      价值漏损率%受碳汇价格、项目价值及投入总成本等因素的影响,不适合单独作数值模拟分析
      风险调整贴现率%受碳汇价格、项目价值及投入总成本等因素的影响,不适合单独作数值模拟分析
      林业生产环境固碳量t受碳汇价格、项目价值及投入总成本等因素的影响,不适合单独作数值模拟分析
      劳动力价格元/工日数值模拟分析
      木材价格元/m3数值模拟分析
      主观参数投资者要求的回报率%由风险调整贴现率和价值漏损率确定,不作数值模拟分析
    • Table 3. Afforestation costs of slash pine carbon sequestration forests per unit area

      View table
      View in Article

      Table 3. Afforestation costs of slash pine carbon sequestration forests per unit area

      项目单位数量单价/元总金额/元
      营造林成本31920.0
      造林支出9120.0
      清山用工工日/hm222.5140.03150.0
      整地用工工日/hm218.0140.02520.0
      栽植用工工日/hm212.0140.01680.0
      扩穴培土用工工日/hm27.5140.01050.0
      种苗费用株/hm21800.00.4720.0
      前3年抚育总支出(共5次)元/hm222800.0
      除杂抚育用工工日/hm275.0140.010500.0
      施肥抚育用工工日/hm230.0140.04200.0
      间伐抚育支出工日/hm222.5140.03150.0
      化肥费用kg/hm21650.03.04950.0
      林业三防年投入a元/hm2/a1.01500.01500.0
      造林当年基础设施建设元/hm21.01500.01500.0
      木材采运费用m3170.0
      碳汇交易成本b元/hm2/a1.059.559.5
    • Table 4. Calculation results of the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project

      View table
      View in Article

      Table 4. Calculation results of the critical threshold of optimal investment timing and option value of carbon sequestration afforestation project

      项目阶段投资时机临界阈值/(元/t)投资期权价值/(万元/hm2
      前期规划备案阶段79.230.12
      项目建设阶段57.330.59
    Tools

    Get Citation

    Copy Citation Text

    Xianlei CAO. Investment timing and option value of afforestation carbon sequestration project under carbon trading mechanism[J]. Resources Science, 2020, 42(5): 825

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Received: Aug. 10, 2019

    Accepted: --

    Published Online: Apr. 15, 2021

    The Author Email:

    DOI:10.18402/resci.2020.05.03

    Topics