Blasting, Volume. 39, Issue 2, 16(2022)

Reasonable Stemming Length of Charge Hole in Deep Borehole Parallel Cut

OUYANG Jian, SHI Xiu-zhi, ZHANG Zong-guo, and LUO Zhi-hua
Author Affiliations
  • [in Chinese]
  • show less
    References(1)

    [12] [12] YILMAZ O,UNLU T.Three dimensional numerical rock damage analysis under blasting load[J].Tunnelling and Underground Space Technology,2013,38:266-278.

    CLP Journals

    [1] ZHANG Yan-jun, LEI Mei-rong, ZHANG Dong-rang, GOU Jing-guo. Numerical Simulation of Small Hole Stemming under Blast Load[J]. Blasting, 2023, 40(2): 75

    [2] CUI Xue-jiao, LI Qi-yue, TAO Ming, HONG Zhi-xian, ZHAO Ming-sheng, LI Jie, ZHOU Jian-min, YU Hong-bing. Research on Explosive-Rock Matching System based on XGBoost[J]. Blasting, 2023, 40(3): 31

    [3] XIA Shu-yuan, DONG Yong-feng, WANG Li-qin. Study on Blasting Lumpiness by XGBoost Model based on Feature Engineering[J]. Blasting, 2023, 40(2): 97

    Tools

    Get Citation

    Copy Citation Text

    OUYANG Jian, SHI Xiu-zhi, ZHANG Zong-guo, LUO Zhi-hua. Reasonable Stemming Length of Charge Hole in Deep Borehole Parallel Cut[J]. Blasting, 2022, 39(2): 16

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Received: Jan. 4, 2022

    Accepted: --

    Published Online: Jan. 24, 2024

    The Author Email:

    DOI:10.3963/j.issn.1001-487x.2022.02.003

    Topics