BLASTING, Volume. 42, Issue 1, 1(2025)
Shared Control Theory and Experimental Study on Open-pit Mine Blasting
[1] [1] McKee D J. Understanding mine to mill[M]. Brisbane: CRC ORE, 2013.
[2] [2] B Varannai, D Johansson, H Schunnesson. Crusher to mill transportation time calculation-the aitik case[J]. Minerals, 2022, 12(2): 17-21.
[12] [12] X N Bui, Y Choi, V Atrushkevich, et al. Prediction of blast-induced ground vibration intensity in open-pit mines using unmanned aerial vehicle and a novel intelligence system[J]. Natural Resources Research, 2020, 29(2): 71-90.
[13] [13] R S Faradonbeh, M Monjezi. Prediction and minimization of blast-induced ground vibration using two robust meta-heuristic algorithms[J]. Engineering With Computers, 2017, 33(4): 35-51.
Get Citation
Copy Citation Text
LI Ping-feng, GUO Jiang, ZHAO Pei-dong, TANG Hong-pei. Shared Control Theory and Experimental Study on Open-pit Mine Blasting[J]. BLASTING, 2025, 42(1): 1
Category:
Received: Oct. 10, 2024
Accepted: Mar. 21, 2025
Published Online: Mar. 21, 2025
The Author Email: