Design and Construction of Demolition Blasting for Cofferdam at Tailrace Outlet of Baihetan Hydropower Station
[2] [2] QIAO Ping,BU Junrui,ZHANG Weiming,et al.Explosive demolition technology of cofferdam removal in complex environment[J].Blasting,2016,33(4):9093.(in Chinese)
[4] [4] WANG Hongbin,WANG Xiao.Explosive demolition technology analysis of diversion tunnel cofferdam at left bank in Baihetan Hydropower Station[J].Blasting,2017,34(1):108112.(in Chinese)
[6] [6] LIU Meishan,LI Dan,PENG Cuiling,et al.Analysis of key problems of explosive demolition for cofferdam of water conveyance tunnel on large hydropower station[J].Blasting,2006,23(2):8084.(in Chinese)
[8] [8] SUN Yunfeng,LI Chong,MENG Tao,et al.Demolition blasting for cofferdam and reserved rock ridge of intake in a water diversion project[J].Engineering Blasting,2020,26(3):3844.(in Chinese)
[10] [10] PENG Shaoyin.Demolish blasting technology on inlet cofferdam of left diversion tunnel in Wudongde Hydropower Project[J].Electric Power Survey & Design,2019(12):4550,74.(in Chinese)
[12] [12] LIU Bensen,RONG Jinsong,SUN Quan.Technlogy for inlet cofferdam demolition of diversion tunnel construction on left bank of Wudongde Hydropower Station[J].Water Resources and Hydropower Engineering,2016,47(S2):113116.(in Chinese)
[14] [14] LIAO Chenglin,YANG Yuyin.Controlled blasting technique for cofferdam removal at tunnel exit[J].Water Sciences and Engineering Technology,2020(3):4449.(in Chinese)
[16] [16] LIU Yu,XIAO Dengyong,PENG Dayong,et al.Blasting demolition of reserved rock ridge in diversion tunnel inlet[J].Engineering Blasting,2016,22(3):5860,64.(in Chinese)
[18] [18] LIU Meishan,ZHANG Zhengyu,LI Yongchi,et al.Blasting demolition of cofferdam inlet of water diversion tunnel at Goupitan Hydropower Station[J].Engineering Blasting,2005,11(1):2529.(in Chinese)
[20] [20] LIU Meishan,ZHANG Zhengyu,SHEN Siyuan,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnelon of Xiaowan Hydropower Station[J].Water power,2004,30(10):4547.(in Chinese)
[22] [22] LI Hantao,CHEN Wenke,WANG Hui,et al.Demolition blasting of rock bar cofferdam at tail water of underground powerhouse of Wunonglong Hydropower Station[J].Electric Power Survey & Design,2018(12):5155.(in Chinese)
[24] [24] ZHAO Zhongyu,LIANG Xiangqian,WEN Xinping.Blasting demolition and safety control for rock ridge of Yumenkou Extension Pumping Station[J].Engineering Blasting,2017,23(4):8285.(in Chinese)
[26] [26] YUAN Jiangxia,XU Yucai.The demolition blasting of the reserved rock ridge cofferdam for the intake of circulating water of Middle Yellow Projection[J].China Rural Water and Hydropower,2020(8):211213,220.(in Chinese)
[28] [28] ZHANG Wenxuan,ZHANG Zhenyu,FAN Changyu,et al.Explosive demolition of cofferdam and rockdyke of water conveyance tunnel on Dachaoshan Hydropower Station[J].Blasting,2000,17(S1):207210.(in Chinese)
[30] [30] GUO Shiming,WANG Wenhui,LIU Hua,et al.Test and study on the blasting removal of the cofferdam in the tailrace mouth of Dachaoshan Hydropower Station[J].Water power,2001(12):2629,67.(in Chinese)
[32] [32] LI Quan.Analysis and comparison of several calculation formulas of specific charge underwater drilling blasting[J].Blasting,2012,29(1):9497.(in Chinese)
[34] [34] ZHANG Zhibo,LI Chunjun,LI Hongyong,et al.Application of air bubble purdah in the damping measure in the underwater blasting[J].Blasting,2003,20(2):7576,89.(in Chinese)
[36] [36] CHEN Ming,ZHONG Quan,LU Wenbo,et al.Study on water flow impact residue technology of explosive demolition of diversion tunnel intake cofferdam[J].Blasting,2010,27(3):7376,80.(in Chinese)
[38] [38] LI Jinhe,LIU Meishan.Basting demolition technology and effect analysis of the diversion tunnel cofferdam in Xiluodu Hydropower Station[J].Engineering Blasting,2011,17(3):5357.(in Chinese)
[40] [40] ZHANG Zhongwei,REN Ge,LI Hongtao.Explosive demolition of intake cofferdam of diversion tunnel on Jingping ⅡHydropower Station[J].Blasting,2011,28(4):7780.(in Chinese)
[42] [42] SHAO Xiaoning,ZHANG Daozhen,ZHOU Enquan,et al.Demolition blasting of reserved rock ridge cofferdam for intake of circulating water of units in electric power plant[J].Engineering Blasting,2014,20(3):2528.(in Chinese)
Get Citation
Copy Citation Text
WU Faming, DUAN Xingping, XU Jinpeng, YANG Zhaowei, ZHOU Tao, PENG Zhengliang. Design and Construction of Demolition Blasting for Cofferdam at Tailrace Outlet of Baihetan Hydropower Station[J]. BLASTING, 2023, 40(1): 100
Category:
Received: Sep. 10, 2022
Accepted: --
Published Online: Jan. 22, 2024
The Author Email: Faming WU (771851834@qq.com)