BLASTING, Volume. 41, Issue 2, 151(2024)
Numerical Simulation and Construction Design of Blasting Demolition of Doublecylinder Old Ammonium Nitrate Granulation Tower
[2] [2] LEI Zhen,ZHANG Zhengcheng,SONG Wenfeng,et al.Vibration study on demolition of two 85 m reinforced concrete chimneys by simultaneous blasting[J].Blasting,2014,31(4):9295,139.(in Chinese)
[4] [4] GAO Wenle,DUAN Yaokui,LIU Penghui,et al.Numerical simulation study on blasting demolition of a 120 m high reinforced concrete exhaust tower[J].Blasting,2022,39(1):101106,129.(in Chinese)
[6] [6] ZHANG Jianhua,LI Jiangjiang,HUANG Gang,et al.Numerical study on optimization of blasting demolition scheme of highrise chimney in complex environment[J].Blasting,2023,40(1):115123.(in Chinese)
[8] [8] XUE Kejun,HU Kunlun,YANG Hui,et al.Directional controlled demolition blasting of 108 m high prilling tower in complex environment[J].Engineering Blasting,2021,27(2):100107.(in Chinese)
[10] [10] GAI Sihai.Controlled blasting demolition of 90 m high prilling tower[J].Engineering Blasting,2016,22(6):5557.(in Chinese)
[12] [12] HU Bin,YANG Saiqun,LI Hongwei,et al.Calculation and numerical simulation of blasting cut angle of ultrahigh steel mixed chimney[J].Engineering Blasting,2022,28(1):99106.(in Chinese)
[14] [14] YANG Hui,YUAN Yishuo,CHAI Yabo,et al.Directional demolition blasting of 180 m high chimney in complex environment[J].Engineering Blasting,2022,28(2):8492.(in Chinese)
[16] [16] LI Yujing,ZHAO Wen,ZHANG Baoliang,et al.Demolition blasting of a 100m highsteel concrete chimney with small collapse angle[J].Engineering Blasting,2021,27(6):8085,91.(in Chinese)
[18] [18] LI Fei,SUN Fei,GU Yun,et al.Demolition technology of steelconcrete chimney with 120 m high steel inner tube by blasting[J].Blasting Equipment,2021,50(3):4550.(in Chinese)
[20] [20] SUN Jinshan,XIE Xianqi,JIA Yongsheng,et al.Downsit and early fracture prediction of reinforced concrete chimney blasting demolition[J].Explosion and Impact,2022,42(8):160174.(in Chinese)
[22] [22] WANG Jianguo,LUO Shiyun,YIN Jiuqing,et al.Blasting demolition technology of chimney under extremely close protection conditions[J].Construction Technology,2021,50(3):4951.(in Chinese)
[24] [24] GAO Wenle,ZHAO Delong,LI Yuanzhen,et al.Influence of delayed time difference on demolition blasting effect of multisection loadbearing column frame structure[J].Blasting Equipment,2021,50(2):5054.(in Chinese)
[26] [26] GAO Wenle,ZHU Maoxun,LI Yuanzhen,et al.Directional blasting demolition of hyperbolic cooling tower in power plant and numerical analysis of blasting effect[J].Blasting Equipment,2020,49(4):5257.(in Chinese)
[28] [28] YU Shubao.Study on demolition principle and application of ultrahigh chimney by codirectional folding blasting in complex environment[D].Beijing:China University of Mining and Technology(Beijing),2019.(in Chinese)
Get Citation
Copy Citation Text
KONG Qing-liang, XIA Zhi-yuan, WANG Gang, LIU Ming-feng, QIAN Ming-yuan, YANG Fan, GAO Peng-fei. Numerical Simulation and Construction Design of Blasting Demolition of Doublecylinder Old Ammonium Nitrate Granulation Tower[J]. BLASTING, 2024, 41(2): 151
Category:
Received: Apr. 14, 2023
Accepted: --
Published Online: Aug. 29, 2024
The Author Email: Peng-fei GAO (568662152@qq.com)