Vibration Response and Safety Control of Frame-shear Structure Adjacent to Mine Blasting

YANG Yu-min1, ZHAO Mo-xi1, ZHOU Chuan-bo1、*, ZHANG Sheng2, HE Guang-long2, HAO Run-hua3, and ZHANG Yu-qi1
Author Affiliations
  • 1Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074, China
  • 2Inner Mongolia Shengli Zhongwei Blast Co., Ltd., Ordos 010300, China
  • 3Ordos Public Security Bureau Public Security Management Detachment Dangerous Management Brigade, Ordos 017001, China
  • show less

    The impact of blasting vibration on surrounding buildings has been widely concerned. Based on the deep hole bench blasting project of Changtan Open-pit Coal Mine, the characteristics of the adjacent 11-story frame-shear structure office building are comprehensively analyzed. After several blasting vibration tests, the distribution characteristics of vibration velocity and main frequency in different directions were analyzed. The significance of elevation difference on vibration velocity in various directions was obtained through single-factor analysis. Finally, based on the dimensional analysis method, a vibration velocity prediction model under the influence of multiple factors was studied, proposed, and applied to the blasting safety charge design. The main conclusions are as follows: with the increase of floors, the primary vibration direction changes from horizontal radial (X) to horizontal tangential (Y), and finally to vertical (Z). In most working conditions, the PPVx and PPVy are not more than 0.17 cm/s and 0.213 cm/s, respectively, and the elevation has little influence. The PPVz is concentrated in 0.05~0.41 cm/s, and the elevation amplification effect is significant in 7~11 layers. The maximum charge per delay, total charge amount, and horizontal distance are substantial for the three-axis PPVs. The elevation difference is not significant for the PPVx but significant for the PPVy and PPVz. The main vibration frequency is concentrated in 3~12 Hz, and some reach 16~30 Hz. Based on the vibration prediction model for the office building, combined with the blasting safety regulations and the blasting parameters under the most dangerous working conditions, the total charge of the bottom blasting should be within 10 267 kg, and the total charge of the deep hole bench blasting should be between 8268~8883 kg.

    Tools

    Get Citation

    Copy Citation Text

    YANG Yu-min, ZHAO Mo-xi, ZHOU Chuan-bo, ZHANG Sheng, HE Guang-long, HAO Run-hua, ZHANG Yu-qi. Vibration Response and Safety Control of Frame-shear Structure Adjacent to Mine Blasting[J]. BLASTING, 2025, 42(1): 166

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Apr. 22, 2024

    Accepted: Mar. 21, 2025

    Published Online: Mar. 21, 2025

    The Author Email: Chuan-bo ZHOU (cbzhou@cug.edu.cn)

    DOI:10.3963/j.issn.1001-487x.2025.01.020

    Topics