Electronics Optics & Control, Volume. 26, Issue 9, 54(2019)
A Method of Generating Mine-Laying Scheme for Port Blockade Based on Channel Divergence
In order to solve the problems of low automation level, and low efficiency, accuracy and reliability of the existing manual operation mode and mine-laying aided decision-making system in the formulation of mine-laying scheme, a new method for fast automatic generation of mine-laying scheme is proposed.This method designs a divergence model of port entrance and main channel, with consideration of the impact of various marine environmental factors and hostile anti-mine threats.Combined with the theory of solution of geodetic problem and water depth interpolation and extraction technology, an accurate mine-laying scheme for port blockade is produced quickly and automatically. The simulation experiment results show that the mine-laying scheme generated by this method conforms to the actual situation of sea area and has preferable accuracy, reliability and practicability.
Get Citation
Copy Citation Text
SHENG Liang, QIU Zhiming, LUO Rong, MENG Xiangyao. A Method of Generating Mine-Laying Scheme for Port Blockade Based on Channel Divergence[J]. Electronics Optics & Control, 2019, 26(9): 54
Category:
Received: May. 22, 2019
Accepted: --
Published Online: Dec. 20, 2020
The Author Email: