Journal of Terahertz Science and Electronic Information Technology , Volume. 19, Issue 6, 1041(2021)

Sensitivity index requirements and assessment of power line spike signal for shipborne missile

DU Zhe*, GONG Linshu, WANG Yi, HUANG Xinhua, and FENG Anan
Author Affiliations
  • [in Chinese]
  • show less

    The shipborne missile is considered as an on-board device when it is on duty and an aircraft when it is in flight. GJB151B-2013 specifies that the shipborne platform equipment needs to be tested by the CS106 project. Nevertheless, the missile is not directly connected to the ship's power grid. If the assessment is still based on the spike signal index specified in GJB151B-2013, it is obvious that there exists a case of over testing. In view of the tailoring requirements of the shipborne missiles in the electromagnetic compatibility CS106 index, the evaluation requirements are fully analyzed and studied, and experimental cutting recommendations are derived.

    Tools

    Get Citation

    Copy Citation Text

    DU Zhe, GONG Linshu, WANG Yi, HUANG Xinhua, FENG Anan. Sensitivity index requirements and assessment of power line spike signal for shipborne missile[J]. Journal of Terahertz Science and Electronic Information Technology , 2021, 19(6): 1041

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Jan. 5, 2020

    Accepted: --

    Published Online: Feb. 25, 2022

    The Author Email: Zhe DU (dudo1987@163.com.)

    DOI:10.11805/tkyda2020009

    Topics