High Power Laser and Particle Beams, Volume. 36, Issue 8, 084003(2024)

Design and implementation of linear injector timing system for 300 MeV proton and heavy ion accelerator

Xiaodong Han1...2,3, Donge Liu2,3,4, Zhe Xu1,3, Ruifeng Zhang1,3, Shilong Li1,3, Ruihuai Zhou4, and Yan Cong13,* |Show fewer author(s)
Author Affiliations
  • 1Institute of Modern Physics, Chinese Academy of Sciences, Lanzhou 730000, China
  • 2School of Nuclear Science and Technology, Lanzhou University, Lanzhou 730000, China
  • 3School of Nuclear Science and Technology, University of Chinese Academy of Sciences, Beijing 100049, China
  • 4Advanced Energy Science and Technology Guangdong Laboratory, Huizhou 516003, China
  • show less

    A linear timing system was designed for the linear injector of Harbin Institution of Technology’s Space Environment Simulation and Research Infrastructure (SESRI) -300 MeV proton and heavy ion accelerator. The linear timing system provides precise timing trigger signals for linear accelerator chopper system with pulse operation mode, low-level RF control system, beam current diagnostic and feedback system to meet the demands of physical beam tuning. The system hardware, based on Field Programmable Gate Array (FPGA), realizes precise timing control of related equipment of linear timing system in internal trigger mode and external trigger mode, as well as the control and safety interlock of chopper. The hardware can realize optical signal communication, W5300 Ethernet communication, multiple relay outputs and multiple synchronized trigger signals with precise timing outputs. At the same time, the use of optical signal communication module will facilitate the cascade of systems and system scalability, which can meet the large-scale needs of linear gas pedal timing system. The user high level software is developed based on the distributed architecture of EPICS (Experimental Physics and Industrial Control System). The linear timing system has been successfully used in SESRI-300 MeV and SSC-LINAC of Institute of Modern Physics (IMP), and has operated stably and reliably for a long period of time without any failure.

    Keywords
    Tools

    Get Citation

    Copy Citation Text

    Xiaodong Han, Donge Liu, Zhe Xu, Ruifeng Zhang, Shilong Li, Ruihuai Zhou, Yan Cong. Design and implementation of linear injector timing system for 300 MeV proton and heavy ion accelerator[J]. High Power Laser and Particle Beams, 2024, 36(8): 084003

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Jan. 30, 2024

    Accepted: Apr. 24, 2024

    Published Online: Aug. 8, 2024

    The Author Email: Cong Yan (congyan@impcas.ac.cn)

    DOI:10.11884/HPLPB202436.240041

    Topics