High Power Laser and Particle Beams, Volume. 36, Issue 7, 075003(2024)

Influence analysis of cascading failure in linear transformer driver caused by group prefire

Zhenbo Wan and Weidong Ding*
Author Affiliations
  • School of Electrical Engineering, Xi’an Jiaotong University, Xi’an 710049, China
  • show less

    A circuit model is established to analyze the possible cascading failure process of group prefire in 28-stage linear transformer driver (LTD). The results show that when a 4-stage group is triggered by mistake, it will cause the entire 28-stage LTD chain action, and the generated fault voltage cannot be limited by the isolation switch at the output of the 28-stage LTD. In addition, when the faulty group is located downstream of the LTD, the voltage propagating upstream along the transmission line will produce a peak field strength on the transmission line of the lower impedance of the first group that is much higher than the normal operations, which may cause the insulation failure of the device. By appropriately increasing the gap between the inner and outer conductors of the transmission line of the first group, the peak field intensity caused by the cascading failure can be weakened without affecting the output amplitude and waveform of the load current, thus improving the reliability of the operation of the device.

    Keywords
    Tools

    Get Citation

    Copy Citation Text

    Zhenbo Wan, Weidong Ding. Influence analysis of cascading failure in linear transformer driver caused by group prefire[J]. High Power Laser and Particle Beams, 2024, 36(7): 075003

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category: Special Column of 4th Symposium on Frontier of HPLPB

    Received: Feb. 26, 2024

    Accepted: May. 20, 2024

    Published Online: Jun. 21, 2024

    The Author Email: Ding Weidong (wdding@xjtu.edu.cn)

    DOI:10.11884/HPLPB202436.240063

    Topics