Delay Time of Two-way Cut Demolition Blasting of 100 m High Reinforced Concrete Chimney

GAO Wen-le1,*... LIU Zhi-cheng1, LI Kun-peng1 and SHI Zhuo-jin2 |Show fewer author(s)
Author Affiliations
  • 1[in Chinese]
  • 2[in Chinese]
  • show less

    Due to the limitation of the size of the site, the demolition blasting of the tall chimney needs to be collapsed.In order to further study the optimal delayed initiation time of the upper and lower blasting cuts in the two-way folding directional dumping blasting demolition of a 100 m reinforced concrete chimney in a complex environment, a common node separation model is established with LS-DYNA and Hypermesh, and the steel joints and concrete joints are directly produced as unit bodies.At the same time, the numerical simulation results are compared and analyzed with the actual project.Through the simulation analysis of the collapse process and results under different delay time of the upper and lower cuts of the chimney, 1 s, 1.5 s, 2 s, 2.5 s and 3 s, the collapse degree of the chimney, and the explosion range and after analyzing and comparing the speed of chimney touching the ground, it is determined that the optimal delay time of the upper and lower cuts is 2.5 s.The result of numerical simulation calculation is highly consistent with the actual project.

    Tools

    Get Citation

    Copy Citation Text

    GAO Wen-le, LIU Zhi-cheng, LI Kun-peng, SHI Zhuo-jin. Delay Time of Two-way Cut Demolition Blasting of 100 m High Reinforced Concrete Chimney[J]. BLASTING, 2021, 38(2): 128

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Feb. 5, 2021

    Accepted: --

    Published Online: Feb. 2, 2024

    The Author Email: Wen-le GAO (wenlegao@163.com)

    DOI:10.3963/j.issn.1001-487x.2021.02.019

    Topics