BLASTING, Volume. 38, Issue 1, 58(2021)

Tests and Application of Smooth Blasting on High-stage Slope in Zhangzhuang Iron Mine

CHEN Wu-jiu1、*, ZHANG De-ming2, and WANG Yu-fu1
Author Affiliations
  • 1[in Chinese]
  • 2[in Chinese]
  • show less

    Large diameter deep hole blasting has been used for ore caving mining in Zhangzhuang iron mine.To effectively control the blasting impact on the integrity of the high-stage slope,the mine introduced a smooth blasting technology based on the engineering characteristic of the mine and the application of existing controlled blasting technology when a new middle section increased to 90 m high.According to different linear charge densities,a blasting industrial test was carried out after fixing the blasting parameters such as the hole diameter,charging diameter and hole spacing.By using the goaf scanning technology,the boundary shape of the goaf was drawn after mining of the whole stope.And then,the actual effect of blasting tests in each group was analyzed.Finally,the main smooth blasting parameters suitable for the high-stage slope were determined as follows:the hole diameter was 165 mm,the charging diameter was 70 mm,the decoupling coefficient was 2.36,and the linear charging density was 2 kg/m.This technology has been widely used in the other stopes of Zhangzhuang iron mine.

    Tools

    Get Citation

    Copy Citation Text

    CHEN Wu-jiu, ZHANG De-ming, WANG Yu-fu. Tests and Application of Smooth Blasting on High-stage Slope in Zhangzhuang Iron Mine[J]. BLASTING, 2021, 38(1): 58

    Download Citation

    EndNote(RIS)BibTexPlain Text
    Save article for my favorites
    Paper Information

    Category:

    Received: Oct. 8, 2020

    Accepted: --

    Published Online: Jan. 25, 2024

    The Author Email: Wu-jiu CHEN (13855581259@163.com)

    DOI:10.3963/j.issn.1001-487x.2021.01.009

    Topics